Hobart General Post Office (Hobart GPO) is a landmark building located on the corner of Elizabeth Street and Macquarie Street in Hobart, Tasmania, Australia. It stands next to the former Mercury Building and has served as the headquarters of the Tasmanian Postal system since its construction in 1905. The building has been listed on the Commonwealth Heritage List since 2004.

In recent years Australia Post has moved some operations away from this building to more modern facilities and the remaining floor space has been revamped and repurposed to suit office space. The office space is rented out to businesses.

Being heritage listed and with the inability to make significant changes to the façade, windows and other aspects of the building means human comfort relies on the efficient and effective performance of the heating, ventilation and cooling systems.

Australia Post and contractor Engie Services had a requirement to understand the performance of the HVAC system and it’s components, the times and days that the all spaces within the building were being utilised and the energy requirements throughout the day for the tenancies.

To determine utilisation of the building and the way that people moved about throughout the day, Australia Post installed 19 infrared people counting sensors. The sensors anonymously monitored people movements and reported them back to the AlphaX Cloud system for later analysis. Australia Post also fitted 10 Temperature, Humidity and Pressure sensors at strategic locations throughout the building to augment the data being generated by the building management systems own sensors. These locations were selected to provide environmental comfort information in areas where people were most likely to be working throughout the day such as offices and sorting areas. Several sensors were also installed in areas that were less often accessed and did not have any BMS monitoring.

CO sensors were installed on each floor to again augment existing BMS data. Current measuring sensors were installed on each of the tenanted areas to understand energy utilisation throughout the day, for each day for the seasons.

Vibration Sensors were fitted to key water pumps and chillers at the site to determine maintenance schedules. All of the sensors transmitted their data through to a LoRaWAN gateway that was installed at site and fed through to the AlphaX Cloud platform.

The outcomes of this project were as follows:

  • Location – no FM’s based in TAS hence the ability to monitor remotely
  • Understanding of the occupancy and operational hours for the AP space and the subtenants.
  • Understanding of the energy end uses and times/days
  • The ability to monitor occupant comfort and air quality remotely
  • The ability to Monitor key asset performance and pro-actively schedule servicing

Download PDF

For more information about the project, its implementation, or the potential application of similar solutions to your operations, please feel free to reach out to us. Our team would be more than happy to discuss the project’s intricacies, the benefits realised, and how these modern technologies could be adapted to enhance your operational efficiency, reliability, safety, and sustainability. We look forward to hearing from you.

Contact Us

Lets Chat

Get in touch with us today to start your digital transformation journey. Our team is ready to answer your questions and explore how we can help your organization thrive.